The RiskWatch free trial is 30 days of full access to the risk and compliance platform, with no credit card required. Run a real readiness assessment against your own organization. All 40+ frameworks, the full evidence vault, the cross-mapping engine, nothing throttled, nothing locked. Decide after 30 days, not before.
Everything you need to run a real readiness assessment.
Your trial is the full RiskWatch platform. Nothing throttled, nothing locked. Run a survey, capture evidence, score against any of 40+ frameworks, and walk into your next audit prepared.
Full platform access
The whole stack from day one, risk register, evidence vault, control libraries, cross-mapping engine, vendor module, policy authoring, and reporting.
Pre-built questionnaires for vendor, internal-control, physical-security, and IT-risk assessments. Sample data lets you test workflows before importing your own.
Vendor risk questionnaires (SIG, CAIQ aligned)
ISO 27001 internal audit checklist
HIPAA Security Rule risk analysis template
PCI DSS v4.0 self-assessment template
White-glove activation
A RiskWatch implementation specialist walks your team through setup. Optional, but most teams take it, average activation runs 30 minutes.
Live setup call with a RiskWatch specialist
Framework selection + scoping help
Survey customization for your environment
Direct line for trial-period questions
Trusted by 500+ risk and compliance teams
60s
From signup to first assessment
40+
Pre-built framework libraries
0
Credit card required to start
What teams ship in 30 days
What customers actually do during their RiskWatch trial.
Real outcomes from the first 30 days. The numbers below come from customer interviews after their trials converted to paid contracts.
5 → 1tools replaced
Five GRC tools collapsed into one.
Most teams arrive running spreadsheets for risk, a separate tool for vendor reviews, a third for evidence storage, a fourth for policy management, and email for everything else. Trial week one usually proves one platform handles all of it.
“We had been running OneTrust for privacy, ServiceNow for IT risk, and a half-dozen spreadsheets for vendor due diligence. RiskWatch absorbed all of it inside the trial.”
Marie L.
DPO · Multinational SaaS, 4,400 employees
30 daysto first audit
From signup to inspection-ready.
Teams that come in with a fall ISO 27001 audit on the calendar typically use the trial to run the gap assessment, build the Statement of Applicability, and start evidence collection. By day 30 the audit prep is on track.
“We needed an ISO 27001 surveillance audit done by Q4. The trial got us through the gap analysis and SoA in under three weeks. We signed the contract before the trial ended.”
James R.
VP Information Security · Healthcare SaaS, 1,200 employees
60+OCGs in one library
One control library, every framework.
RiskWatch ships a unified Object Control Group (OCG) library where ISO 27001 A-controls, SOC 2 TSC, NIST 800-53 r5, and HIPAA Security Rule safeguards cross-map to the same evidence. One control answer satisfies multiple auditors.
“The cross-mapping was the unlock. We answered the SOC 2 questionnaire once and the platform showed us we'd already covered 70% of our ISO 27001 controls.”
Priya S.
Head of GRC · Fintech infrastructure, 600 employees
Trial FAQ
Common trial questions
Quick answers from the team that runs the activation calls. If you don't see your question here, the trial form ships you to a specialist who'll answer anything.
Start in 5 minutes
Start your 30-day RiskWatch trial.
No credit card. Full platform access. Setup link in your inbox in under a minute. White-glove activation included.